
Rates and Charges - Stony Plain
West Parkland serves its members in Parkland County and in its Special Franchise area in the Village of Spring Lake. It also serves customers located in some areas of the Town of Stony Plain. Some rates vary from area to area.
STONY PLAIN SPECIAL |
|
---|---|
Co-op Base Cost | $31.20 Per Month |
Co-op Distribution Cost | $1.76 per gigajoule |
Gas Rate | Wholesale Gas Cost |
Reserve Account Charge | $2.75 per month |
Service Installation | Per Stony Plain Installation Rates |
PENALTIES |
|
---|---|
NSF Charge | $25.00 |
Lock off notification (Red Tag) | $75.00 |
Disconnect | $125.00 |
Reconnect | $125.00 |
Billing Arrears | 2% Per Month |
NOTE: G.S.T. IS NOT INCLUDED
Residents in the “Rural Franchise #173” and in “Village of Spring Lake Special Franchise” area are members of the West Parkland Gas Co-op Ltd. They have a different installation fee schedule that permits a lower “Base Cost” than residents of the Stony Plain Special Franchise.
Stony Plain – Installation Charges
CHARGES FOR SERVICE LINE CONSTRUCTION WITHIN STONY PLAIN SPECIAL FRANCHISE
- 1. Service Lines - Applicable to all services.
- 1.2 Pipe Installation Cost per Meter:
Pipe Size |
Summer |
Winter |
---|---|---|
15.9 mm or 26.7 mm (up to and including 15 meters) | $1,150.00 | $1,150.00 |
Linear charge for length over 15 meters | $47.00/meter | $64.00/meter |
33.4mm to 60.3 mm (up to and including 15 meters) | $1,190.00 | $1,560.00 |
Linear charge for length over 15 meters | $66.00/meter | $89.00/meter |
Greater that 60mm | Contract Price | Contract Price |
- 1.3 Pavement Breaks: Actual Cost
- 1.4 Crossing: Including highway, railroad, road, pipeline, canal, etc. at actual cost
- 1.5 Compaction: Actual Cost
- 1.6 Shallow Utility Crossing: Actual Cost
- 1.7 Waste Removal: Actual Cost